To add a new workshop: Insert a new row in both the LINEUP sheet (for schedule placement) and the PROJECTS sheet (for details).
The sheet named LINEUP controls the workshop names and their placement in the schedule. If adding a new workshop, find an appropriate empty time slot. Please discuss with the organizers if you need to adjust existing time slots. Workshop names can be changed freely.
The sheet named PROJECTS contains the details for each workshop (author, location, description). Ensure the workshop name in the first column of PROJECTS matches the name used in LINEUP.